PSC FOCUS: AUXILIARY ENGINE SYSTEMS_THE NO.1 HFO PURIFIER IS NOT OPERATIONAL
2026-04-11
PSC FOCUS: AUXILIARY ENGINE MONITORING_THE EXHAUST GAS THERMOMETER OF NO.3 GENERATOR ENGINE (G/E) IS MALFUNCTIONING AND NOT PROVIDING ACCURATE READINGS
2026-04-11
PSC FOCUS: SOLAS STATUTORY DRILLS – INSUFFICIENT FREQUENCY_MORE THAN 25% OF CREW MEMBERS WERE CHANGED, HOWEVER FIRE DRILL AND ABANDON SHIP DRILL NOT PERFORMED WITHIN 24H OF THE SHIP LEAVING THE PORT.
2026-01-24
PSC FOCUS ON FIXED CO2 SYSTEM_PERMANENT CONNECTION PROVIDED BETWEEN THE COMPRESSED AIR SYSTEM...
2025-10-13
FOCUS ON GYRO MAINTENANCE_BOTH GYROS LOST: WHY RENEWAL TIMING MATTERS
2025-09-22
RIGHTSHIP FOCUS FOR SECTION 14: GENERAL APPEARANCE - HULL AND SUPERSTRUCTURE – 14.10
2025-06-30
PSC FOCUS FOR PURIFIER ROOM
2025-04-21
RIGHTSHIP FOCUS FOR SECTION 4: ISM SYSTEM – 4.17
2025-04-02
PSC FOCUS FOR FIRE-EXTINGUISHING SYSTEMS DEEP FAT COOKING/FRYING EQUIPMENT
2024-12-14
PSC OBSERVATION: FLEXIBLE HOSE IN CO2 ROOM
FOCUS FOR LATHE MACHINE FOOT EMERGENCY STOP
2024-10-09
FOCUS FOR THE WEIGHT TOOLS IN CO2 ROOM
2024-04-03
PSC FOCUS FOR HOUSEKEEPING IN MAIN ENGINE FUEL OIL PURIFIER
2024-02-19
FOCUS FOR PSC // SAMPLING POINT CONNECTION TO OIL WATER SEPARATOR
2024-01-18
FOCUS FOR MOORING LINES DURING ALONGSIDE AT PORT
2023-11-27
FOCUS FOR PSC – EMERGENCY LIGHT!
2024-01-19
FOCUS FOR PSC – SAFETY ON DECK – SECURING EQUIPMENT FROM FALLING!
2024-01-19
LUB. OIL LEAK FROM ONE OF AUX ENGINE LUB. OIL COOLER.
2024-01-24
INSULATION MATERIAL ON CO2 ROOM BULKHEAD
2024-01-24
OBSERVATION REGARDING THE POSITION OF A FIRE EXTINGUISHER.
2022-11-22
PSC DEFICIENCY / LIFEBOAT ENGINE WAS UNABLE TO START BY INDEPENDENT BATTERY DURING OPERATIONAL TEST.
2024-02-02
REEFER SOCKET CONNECTION BOXES SUPPLY CABLE LINING
2022-05-26
THE USE OF THE SAFETY PIN DEPENDS ON THE SYSTEM FITTED IN YOUR CO2 ROOM
2022-03-27
CO2 ROOM´S LINE AT OUTSIDE WAS FOUND BADLY CORRODED (COULD BE A DETENTION REASON DURING A PSC)
DAMAGE RELEASE CONTROL CABINET IN CO2 ROOM-CASE 2
2022-02-18
DAMAGE RELEASE CONTROL CABINET IN CO2 ROOM
2022-02-18
A PURIFIER DAMAGE DURING START-UP OPERATION WITH ULSFO.
2022-01-12
DAMAGED GASKET ON INLET TO ME FUEL PUMP
2021-10-20
CO2 SYSTEM - CYLINDER VALVE ACTUATOR
2021-10-14
ONE USCG PSC FINDING REGARDING MACHINERY AND MARINE PIPING SYSTEMS
2024-02-11
CONDITION OF CO2 CYLINDERS HOSES
2021-10-16