PSC FOCUS: HATCH COVER OPERATING ARRANGEMENTS_THE HYDRAULIC PIPELINE FOR NO.4 CARGO HOLD HATCH COVER SYSTEM IS RUPTURED, CAUSING HYDRAULIC OIL LEAKAGE.
2026-04-02
PSC FOCUS: HATCH COVER OPERATING ARRANGEMENTS_THE OPERATING CHAIN FOR NO.3 CARGO HOLD HATCH COVER IS HEAVILY CORRODED AND SIGNIFICANTLY THINNED.
2026-04-01
PSC FOCUS: VOYAGE DATA RECORDER (VDR / S-VDR)_THE VOYAGE DATA RECORDER (VDR) WAS FOUND INOPERATIVE. ALTHOUGH A FLAG STATE DISPENSATION LETTER WAS AVAILABLE ON BOARD, THE MASTER FAILED TO INFORM THE PORT STATE AUTHORITY PRIOR TO ARRIVAL AS REQUIRED. SERVIC
2026-04-01
PSC FOCUS: HATCH COVER SECURING ARRANGEMENTS_FOUR CLEATS OF NO.3 CARGO HOLD HATCH COVER ARE DEFORMED AND NOT PROVIDING PROPER SECURING
2026-03-31
PSC FOCUS: PROPULSION MAIN ENGINE_THE ENGINE TELEGRAPH CONTROL AT THE PORT BRIDGE WING IS NOT FUNCTIONAL FOR MAIN ENGINE START AND STOP DURING INSPECTION
2026-03-31
PSC FOCUS: MARITIME LABOUR CERTIFICATE_THE ISSUING DATE OF THE DMLC PART II STATED ON THE MARITIME LABOUR CERTIFICATE IS INCONSISTENT WITH THE DMLC PART II AVAILABLE ON BOARD DURING THE INSPECTION.
2026-03-31
PSC FOCUS: GAUGES AND INDICATORS_THE RPM INDICATOR OF THE MAIN ENGINE ON THE EMERGENCY MANEUVERING PLATFORM IS NOT WORKING / NOT INDICATING CORRECTLY.
2026-03-30
PSC FOCUS: LIFEBOAT_THE SECURING DEVICE FOR HOLDING THE FREE-FALL LIFEBOAT DOOR IN THE OPEN POSITION IS MISSING
2026-03-30
PSC FOCUS: PERSONAL PROTECTIVE EQUIPMENT (PPE)_DURING LOWERING OF A LIFEBOAT, A CREW MEMBER OPERATED WITHOUT SAFETY GLOVES WHILE HANDLING MOVING MECHANICAL PARTS (WIRES UNDER TENSION). THE MASTER INSTRUCTED A SAFETY MEETING WITH ALL CREW BEFORE DEPARTURE.
2026-03-29
PSC FOCUS: REMOTE MEANS OF CONTROL (OPNENING, PUMPS, VENTILATON, ETC) MACHINERY SPACES_DURING TESTING, LOCAL QUICK-CLOSING VALVES OF DG NO.1 AND DG NO.3 SHOWED HYDRAULIC LEAKAGES.
2026-03-28
PSC FOCUS: CODE 02150_STEERING GEAR_HYDRAULIC PIPELINE CONNECTION SHOWS SEVERAL POINT OF SMALL LEAKAGES. THE SYSTEM IS FULLY OPERATIVE.
2026-03-27
PSC FOCUS: BEAMS, FRAMES, FLOORS-CORROSION_HATCH COVER BEAMS ARE HEAVILY RUSTED AND CORRODED IN SOME POINTS
2026-03-27
INCIDENT FOCUS – PINCH POINT HAZARD
2026-03-26
PSC FOCUS: PERMANENT MEANS OF ACCESS_THE GANGWAY DOESN’T TOUCH THE GROUND, AND ANOTHER SMALLER GANGWAY HAS BEEN SECURED TO THE MAIN ONE TO LET PEOPLE REACH THE VESSEL
2026-03-26
INCIDENT FOCUS: A FIRE IN ENGINE ROOM_SMALL COMPONENT, SERIOUS CONSEQUENCE: FUEL PUMP SHOCK ABSORBER GASKET FAILURE!
2026-03-24
PSC FOCUS: GAUGES, THERHOMETERS, ETC_NUMBER 1 AND 2 GENERATOR ENGINE COOLING WATER PRESSURE GAUGE NOT LEGIBLE.
2026-03-27
PSC FOCUS: EMERGENCY SOURCE OF POWER - EMERGENCY GENERATOR_DURING THE BLACKOUT TEST, AFTER HALF AN HOUR OF OPERATION, THE HIGH-TEMPERATURE COOLING ALARM OF THE EMERGENCY GENERATOR SOUNDED, WITH LEAKAGE ON THE COOLING CIRCUIT.
2026-04-29
PSC FOCUS: MEANS OF CONTROL (OPENING, PUMPS) MACHINERY SPACES_AUXILIARY ENGINE #2 QUICK CLOSING VALVE REPEATEDLY FAILED TO CLOSE DURING TESTING.
2026-03-27
PSC FOCUS: FIRE PUMPS AND ITS PIPES_SECONDARY ACCESS TO EMERGENCY FIRE PUMP LOCKED FROM INSIDE.
2026-03-27
PSC FOCUS: CLEANLINESS_ OIL LEAKAGE OBSERVED INTO CEILING IN CREW DAYROOM, CAUSED BY A LEAKING PIPE TO MOORING WINCH ON DECK ABOVE.
2026-03-27
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 All
Choose Location
Subscribe to AlertClub
This webpage is for the purpose to share experience and knowledge. Please always consider your case based on your encountered facts and conditions together with your related internal and/or external/international regulation.
Success Your changes has been saved