PSC FOCUS: BALLAST WATER MANAGEMENT PLAN_BALLAST WATER MANAGEMENT METHODS INCORRECTLY RECORDED IN BWMP.
2025-11-23
FOCUS ON SECURITY BREACH ON BOARD – SINGAPORE STRAIT
2025-11-21
PSC FOCUS: LIFEBOAT DAVIT EYE DEFORMATION – CRITICAL SAFETY CONCERN_BOTH LIFEBOATS NOT RELEASED/HOOK-RELEASED AND MANEUVERED INTO THE WATER FOR MORE THAN 6 MONTHS. LAST DRILL CARRIED OUT ON 09-04-2025, BUT UNTIL 04-11-2025 SHIP APPLIED A DISPENSATION LETT
2025-11-21
PSC FOCUS: SECURITY + FIRE AND ABANDON SHIP DRILLS
2025-11-20
PSC FOCUS: GALLEY EQUIPMENT_THE CONVECTION OVEN + STEAMER INSIDE GALLEY IS BROKEN DOWN LONG TIME ALREADY. COMPANY NEEDS TO SUPPLY VESSEL WITH REPLACEMENT COMBINED CONVECTION OVEN + STEAMER.
2025-11-18
PSC FOCUS: BOILER ROOM VENTILATION DUCT
2025-11-15
FOCUS ON TESTING EPIRB EPIRB SELF-TEST TIMING REQUIREMENT NOT FOLLOWED
2025-11-13
FOCUS FOR AN UNSAFE CONDITION IN PASSAGEWAY_ENSURING SAFE PASSAGE: ADDRESSING FIRE LINE LEAKAGE AND PREVENTIVE MEASURES
2025-11-09
FOR SECTION 14: GENERAL APPEARANCE – HULL AND SUPERSTRUCTURE – 14.9_FORWARD AND AFT MAST STAY WIRES WERE SHEATHED WITH PLASTIC COVER IN PLACE.
2025-11-03
RIGHTSHIP FOCUS FOR SECTION 9A: HATCH COVER AND LIFTING APPLIANCES – 9.6_HOLD NUMBER THREE, FOUR NUMBERS OF QUICK CLOSING CLEATS RUBBER WASHERS WERE COATED WITH PAINT
2025-11-02
PSC FOCUS ON SEAFARERS' EMPLOYMENT AGREEMENT (SEA)_THE SEA OF TWO PERSONS ON BOARD, MENTIONS THEIR CAPACITY ON BOARD AS BEING CADET...
2025-11-03
PSC FOCUS ON VOYAGE OR PASSAGE PLAN_IN THE LAST VOYAGE IT WAS NOTICED THAT REQUIRED NAVTEX STATIONS ARE NOT FILLED IN ON THE VOYAGE PLAN AND FROM WAYPOINT....
2025-10-28
PSC FOCUS ON MONITORING OF VOYAGE OR PASSAGE PLAN_NO EVIDENCE FOUND OF ANY POSITION FIXING CARRIED OUT DURING LAST VOYAGE AS REQUIRED BY SIGNED PASSAGE PLAN. THE USE OF ECDIS SAFETY SETTING COULD NOT BE EXPLAINED.
2025-10-28
PSC FOCUS ON FIRE DOORS/OPENINGS IN FIRE-RESISTING DIVISIONS_AMONGST TO OTHER FINDINGS, IT WAS NOTICED THAT THE SELF CLOSING MECHANISMS....
2025-10-26
PSC FOCUS ON BALLAST WATER MANAGEMENT PLAN_NO APPROVAL, NO RECORD., NO CRY....
2025-10-25
PSC FOCUS ON GAUGES, THERMOMETERS ETC_LEVEL GAUGE FOR THE STEERING GEAR RESERVE OIL TANK DEFECTIVE
2025-10-17
PSC FOCUS ON ELECTRICAL EQUIPMENT_ELECTRICAL TERMINAL BOX FOR BOW THRUSTER ROOM FAN SEVERELY CORRODED.
2025-10-16
PSC FOCUS ON FIRE DOOR_FIRE DOORS FOR STEERING GEAR COMPARTMENT AND THE STORE NEXT TO IT FOUND HELD IN THE OPEN POSITION.
2025-10-15
PSC FOCUS ON FLAMMABLE LIQUIDS STORED IN STEERING GEAR ROOM_FLAMMABLE LIQUIDS STORED IN STEERING GEAR ROOM...
2025-10-14
PSC FOCUS ON FIXED CO2 SYSTEM_PERMANENT CONNECTION PROVIDED BETWEEN THE COMPRESSED AIR SYSTEM...
2025-10-13
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 All
Choose Location
Subscribe to AlertClub
This webpage is for the purpose to share experience and knowledge. Please always consider your case based on your encountered facts and conditions together with your related internal and/or external/international regulation.
Success Your changes has been saved